PROJECTOthers

Others

OthersJuam Dam Emergency Spillway Construction
Category T / K Basic design
Client K-water
Contractor Yooshin Engineering Corporation
Period July 01, 2009 ~ October 31, 2009
Project Information
  • Location
    Daegwang-ri, Juam-myeon, Suncheon-si, Jeollanam-do, Korea      

 

  • Description     
    • Linear Tunnel L = 542m
    • Curved Tunnel L = 564m

 

  • Technical Issues     
    • Design of the water tunnel (L = 1,106m) for an emergency spillway considering the water flow capacity and the hydraulic stability
    • Foundation design of the overflow weir and transition (inflow / outfall) structures