- Location
Hai-myeon, Goseong-gun, Gyeongsangnam-do, Korea (nearby Samcheonpo Thermoelectric Power Plant)
-
Description
-
Intake Tunnel L = 770m
-
Land Vertical Shaft H = 22m, I.D = 16m
-
Marine Caisson H = 50m, I.D = 13m
- Technical Issues
-
First application of a large diameter (D = 7.2m) shield TBM to the intake tunnel of the power plant in Korea
-
Design of EPB an (Earth Pressure Balance) shield TBM for difficult conditions such as shale / sandstone and the high groundwater pressure (max. 4~5bar)
-
Design of a large diameter shaft (onshore: in-situ concrete, offshore: caisson type considering the marine works)
|