|
|
|
High Rise Building (Lotte World Tower) Construction above Existing Subway Line 8
|
Gangneung Anin Thermoelectric Power Plant (Unit1,2) Water Intake and Discharge Tunnel
|
Goseong Hai Thermoelectric Power Plant (Unit1,2) Water Intake and Discharge Tunnel
|
Development of a Maintenance Platform Based on Asset Management for Underground Structure
|
|
Research on Optimal Design for Room-and-Pillar Underground Space
|
Expansion Works for Soma Museum
|
Surface Nuclear Waste Disposal for the LILW
|
Juam Dam Emergency Spillway Construction
|
Sinuljin Nuclear Power Plant (Unit1,2) Optimal Method of Underwater Intake and Discharge Tunnel
|
Seoul Subway Line 9 (C902) (Cut off wall)
|
Seoul Subway Line 9 (C902) (Temporary retaining structure & tunnel)
|
Sinyeongtong 2nd Apartment Soil Investigation
|
Gwangju Subway Line 1 Yangyu Bridge Pass Method (C1-4)
|
Seoul Subway Transfer Passage (C720)
|
Sinseongnam ~ Yatap 2nd Power Transmission
|
Seoul Subway Transfer Passage (C720)
|