Magok-ri, Hansung-myeon, Gimpo-si, Gyeinggi-do ~ Yeondasan-dong, Paju-si, Gyeonggi-do, Korea
- Description
- Total L = 6,746m
- Tunnel L = 2,900m (Shield TBM 2,780m, BOX 120m)
- Bridge L = 70m
- Technical Issues
- First large diameter (>13m) TBM road tunnel under Han River
- Application of safe shield TBM method to high water level and complex ground conditions
- Improving drilling rate through high-tech mechanized construction and high-quality segment lining
- Improving evacuation function through multifunctional tunnel cross-section planning
|