|  Bagwol-dong ~ Gyo-dong, Gangneung-si, Gangwon-do   
    Description
      Total L = 7,412mTunnel L = 3,096m(Shield TBM Tunnel L = 2,654m, Station Tunnel L = 442m)3 adits   
   Technical Issue              
      Launch of TBM on bedrock layer and an upward advance formaintenance of  TBM alignment
            
            Mini pipe roof reinforcement considering the stability of pile foundation under Gangneung Station
         
 Shield TBM advance preceding 2Arch tunnel considering Gangneung Station Safety
         
 Ground reinforcement of Namdae stream considering the improvement of advance performance in sand gravel layer
         Minimization of the number of adits considering Shield TBM tunnel stability 
 
 |