Bagwol-dong ~ Gyo-dong, Gangneung-si, Gangwon-do
- Description
- Total L = 7,412m
- Tunnel L = 3,096m(Shield TBM Tunnel L = 2,654m, Station Tunnel L = 442m)
- 3 adits
- Technical Issue
- Launch of TBM on bedrock layer and an upward advance formaintenance of TBM alignment
-
Mini pipe roof reinforcement considering the stability of pile foundation under Gangneung Station
-
Shield TBM advance preceding 2Arch tunnel considering Gangneung Station Safety
-
Ground reinforcement of Namdae stream considering the improvement of advance performance in sand gravel layer
-
Minimization of the number of adits considering Shield TBM tunnel stability
|