-
Location
Hwacheon-ri, Suanbo-myeon, Chungju-si, Chungcheongbuk-do ~ Hacho-ri, Mungyeong-eup, Mungyeong-si, Gyeongsangbuk-do, Korea
- Description
- Total L = 11,642m
-
2 Tunnels L = 10,627m
-
Earthworks L = 496m
-
Bridge L = 519m
-
Technical Issues
- Application of two inclined tunnels as an approach to shorten the construction period and promote disaster prevention by installing safety facilities in there
- Design of the tunnel portal with hood structures for minimizing pressure wave effects, considering the express train (Electronic Multiple Unit: EMU-250, design speed: 250km/h)
|