Description
-
Total L = 4,519m
-
Tunnel L = 2,380m
-
Cut and cover Box L = 750m
-
Earthworks L = 389m
-
Technical Issues
- Design of the tunnel considering the high speed train (design speed: 350km/h) in a single track line, the first case in Korea
- Planning of girder supporting piles and grouting (surface and underground) for securing the stability of the electric power substation
- Design of additional facilities to reduce the air pressure caused by running a high speed train in a single track tunnel
|